UCD System Biology Ireland

M&E Cost: € 1.7M. Approx.
Duration: 2012 – 2013

M&E Services Included:

The building has a total area of 1300m2 and was officially opened in December 2013. The building combine’s the expertise of systems engineering, mathematical and computational approaches with state of the art technology platforms.

Project consisted of 500m2 of wet Laboratory’s, Computational, Offices & Meeting rooms. Project includes substantial energy efficiency design including lab ventilation, Heat recovery from plant, High efficiency condensing boilers, Solar Thermal, use of non-potable water sources for toilet flushing and Low Energy lighting and controls and the selection of low energy equipment and solutions throughout.