Project type: Life Sciences
Completion Date: Mechanical & Electrical Design
Our Role: Mechanical & Electrical design
The project was the design and construction of an additional Cleanroom installation for Trend Technologies centre of excellence for injection moulding. The project involved the integration of a new Cleanroom with their existing room into one larger cleanroom to include the integration of all the existing and new M&E service required for the space.
Energy Efficiency:
This has been achieved with the following mechanical and electrical design solutions:
- High Efficiency air cooled liquid chiller plant added to the existing overall central cooling plant installation.
- Fan filter unit technology with EC motors
- High efficiency fan motors with lowest feasible fan power
- Variable speed technology on all fans and pumps.
- Low flow water efficient fittings
- Heat Recovery on all Mechanical Plant
- 2 Port pressure independent control technology to all cooling / heating coils for local control
- Energy-efficient lighting (LED) utilised throughout.
- Energy metering utilised to keep management informed on usage patterns, electricity sub-metering of significant energy end users.
- Building Management System utilised to inform management on energy consumption, space heating, water temperatures, etc.
M&E Services Included:
- New 10 kV Switchgear and cabling and transformer with new MDB
- General Power and Emergency Lighting.
- Full HVAC throughout the building.
- Hot & Cold-Water services.
- Fire Alarm, Access Control, Data, etc.
- Process water installation
- Compressed air installation