UCD Science Centre Fit-out

M&E Cost: € 4.2M. Approx.
Duration: 2013 – 2014

M&E Services Included:

The science Centre Fit-out project represents the final phase of the new UCD science centre. The fit-out over three levels (ground, third and Fourth floors) has a total area of 5600m2 of mixed use research facility.  Phase 1 of the project completed in June 2014 consists of 1800m2 of contemporary office space.  A Key feature of the design solution was the exposure of the building services throughout this phase of the project.  This aspect of the design results in the added requirement for the mechanical and electrical services to contribute to the visual environment.  The final phase of the building is scheduled for completion August 2014. ​

Project includes substantial energy efficiency design features throughout including the selection of low energy equipment and solutions to achieve a BREEAM excellent certification.

Belton Consulting Engineers

B17 Ballymount Corporate Park,
Ballymount Avenue, Dublin 12.

Stay Tuned for updates

2022 - Belton Consulting Engineers