Trend Technologies – Mullingar Co. Westmeath

Project type: Life Sciences
Completion Date: Mechanical & Electrical Design
Our Role: Mechanical & Electrical design

The project was the design and construction of an additional Cleanroom installation for Trend Technologies centre of excellence for injection moulding.  The project involved the integration of a new Cleanroom with their existing room into one larger cleanroom to include the integration of all the existing and new M&E service required for the space. 

Energy Efficiency:

This has been achieved with the following mechanical and electrical design solutions:

  • High Efficiency air cooled liquid chiller plant added to the existing overall central cooling plant installation.
  • Fan filter unit technology with EC motors
  • High efficiency fan motors with lowest feasible fan power
  • Variable speed technology on all fans and pumps.
  • Low flow water efficient fittings
  • Heat Recovery on all Mechanical Plant
  • 2 Port pressure independent control technology to all cooling / heating coils for local control
  • Energy-efficient lighting (LED) utilised throughout.
  • Energy metering utilised to keep management informed on usage patterns, electricity sub-metering of significant energy end users.
  • Building Management System utilised to inform management on energy consumption, space heating, water temperatures, etc.

 

M&E Services Included:

  • New 10 kV Switchgear and cabling and transformer with new MDB
  • General Power and Emergency Lighting.
  • Full HVAC throughout the building.
  • Hot & Cold-Water services.
  • Fire Alarm, Access Control, Data, etc.
  • Process water installation 
  • Compressed air installation 

 

 